Building Update


The concerns that COVID 19 may cause material availability issues continue  as some items are in short supply.

Completed Items
  • The hoods have been connected with the welded exhaust piping. The contractor conduced its own smoke test successfully. The test to be repeated for the fire department and city inspector.
  • Partition Wall Ceiling Track installed at the meeting room corridor. Supplier returned to site to complete corrective actions On site review of sound system wiring with electrical contractor conducted to verify final location(s)
  • Aluminum Light Fixtures- All 23 light fixture frames received.
  • Wall sleeves for the HVAC Ducting cut as required
  • Supplier for the wood trim has been selected
  • With the completion of the Grading around the hall the shrubs have been planted and the sod laid
  • Plumbing at the kitchen drop ceiling location completed
  • Water Heaters installed
  • Wallpaper and ceiling paint selected. Paint color for exterior doors determined
  • Landscape architect site visit completed. Approval letter received
  • Engraved brick installation complete
  • The Captive Aire Kitchen Hoods specified by the Mechanical Engineer qualify for a rebate. Final rebate will be received once the gas meter is activated.

Work in Process

-Security cameras install in process
-The smoke testing of the welded exhaust connective piping hoods in the process of being arranged with the fire department and city inspector to be present
-The construction of the walk-in freezer/ cooler freezer in final stage.
-Drywall in process- The drywalled bulkhead design is intricate and is in process. Taping continues where required.
-Purchasing of tiles, and wallpaper in process.
-The architect indicated the palette for the interior colors. Interior wall paint color and wood stain pending.
-Door Hardware list provided by supplier under review
-Commencing the prep work required of the fire safety plan
-Civil engineer on site review yields two actions required for completion

Quotes/ Specification Development in Process

  • Light Shades- Color to complement new tile selected and approved by architect Sourcing fabric fire-resistant and tested to standards required.
  • Interior wood doors- Site visits by vendors complete.  Quotes under review. 
  • Trim Carpentry quotes under review
  • Kitchen Equipment Alternate Proposals pending
  • Quotes for powder coating aluminum lighting frames received under review, 


Project Manager

Marica Zoric


“Buy A Brick” Fundraiser

By Georgina Kiraly

The “Buy a Brick” campaign has come to a successful completion!  
First, to those of you who bought a brick for yourself, your family and/or friends, “Thank you!”  and “Congratulations!” for being a part of this community project - and for supporting the new hall!
Background
Once the “Buy a Brick” campaign was approved by the Uprava, we consulted with our architect, Peter Lesdow and with Branko Krkljus, to identify locations suitable for the brick installation.   By the time the project was approved, hall construction had progressed to a point where an ideal location was no longer available.  Although the two small areas we were given were well placed near the hall entrance, the spaces and the existing curbs presented many challenges. Thankfully, we were able to overcome these and complete the installation.
After researching the church records back to 1957, and reaching out to individuals and families in our congregation – past and present, near and far - 270 bricks were ordered, and $38,650 was raised for our new hall.  
With Gratitude
Our thanks to Kirkpatrick Stoneworks for donating the engraving work on the centrepieces; to St Catharines Building Supplies for donating shipping costs,  and to Dale Williams of Stone Engraving Ontario,  for bringing this project to a successful completion, in spite of his serious illness.
And special thanks go out to my husband, Richard Sereda, who worked tirelessly with me on the project from beginning to end;  to my sister, Joanne Vasic, who worked by our sides throughout the installation; and to Mara Smiljanich, who managed the financial records for the project over many months.  
Tax Receipts
Tax receipts will be issued in early 2021.  Any questions or concerns should be directed to Vanya Vujic or Denise Mateyk.
In Conclusion
It has been my pleasure to work on this project – and to raise funds for the new hall.    It is my hope that the community will also take pleasure in the brick installation for many years to come!

Note:  Go to YouTube, Radio Niagara to watch a video about our brick campaign.

Kampanja kupovine cigli uspešno je završena!


Pre svega, želim da se zahvalim onima koji su kupili ciglu za sebe, svoju porodicu i/ili prijatelje, i da im čestitam što su bili deo ovog zajedničkog projekta i time podržali izgradnju nove hale!
Kako je sve teklo
Kada je kampanja “Kupite ciglu“ bila odobrena od strane Uprave, konsultovali smo našeg arhitektu Petra Lesdova, kao i Branka Krkljuša, da odrede lokaciju zgodnu za postavljanje instalacije. Do tada je izgradnja sale napredovala do tačke kada idealna lokacija više nije bila dostupna. Iako su dve manje površine koje smo dobili bile zgodno smeštene blizu ulaza u halu, prostor i postojeći ivičnjak predstavljali su veliki izazov. Na sreću, uspeli smo da ga prevaziđemo i dovršimo instalaciju.
Nakon što smo pregledali crkvene spise još od 1957. i kontaktirali pojedince i porodice iz naše parohije – nekadašnje i sadašnje, bliže i dalje – naručeno je 270 cigli i sakupljeno je 38650 dolara za našu novu halu.


Zahvalnica


Hvala kamenorezačkoj firmi Kirkpatrik na donacijama rezbarenih radova na centralnim delovima, zatim firmi Ketrin građevinska roba za pokrivanje troškova dostave, kao i Dejlu Vilijamsu iz Kamenorezačkog udruženja Ontario na pomoći da se ovaj projekat uspešno završi, uprkos njegovoj ozbiljnoj bolesti.
Posebno se zahvaljujem mome suprugu, Ričardu Seredi, koji je neumorno radio sa mnom na ovom projektu od početka do kraja, zatim mojoj sestri, Džoani Vasić, koja je pomagala tokom čitave instalacije, kao i Mari Smiljanić, koja je vodila finansijske spise za projekat svih ovih meseci.  


U zaključku


Bilo je zadovoljstvo raditi na ovom projektu i prikupiti sredstva za novu halu. I nadam se da će naša zajednica biti zadovoljna instalacijom cigli tokom dugog niza godina!

mapping it out

 

delivery of bricks

 

bed preparation